Enter your email address: Subscribe Pinnacle:    

Mission SSC CGL 2017 Day84-Mathematics Comprehensive revision series

Mission SSC CGL 2017 Day84-Mathematics Comprehensive revision series

Mission SSC CGL 2017 Day84-Mathematics Comprehensive revision series

Day84-Mathematics

Dear Students, Welcome to Pinnacle online SSC Coaching Portal. This is the time when you all have already submitted application for SSC CGL 2017 and with this the reverse countdown for tier1 starts. I believe you must be preparing with best of your ability. We generally spend a few hours daily online on Social media. Usually this time is not very productive with respect to preparation. We use it as a time off from preparation. Now, think if the time spent online becomes more productive than the normal preparation itself. Sounds crazy, isn’t it?  We at Pinnacle want your time spent online to get as meaningful as it can be. Here comes Day84-Mathematics of MISSION SSC CGL 2017 day wise Comprehensive revision series.

Day1-MathematicsDay1-Mathematics

Day84-Mathematics

Q1. A boat’s speed in still water is 10 km/hr while river is flowing with a speed of 2 km/ hr. If time taken to cover a certain distance upstream is 4 hour, find the time taken to cover the same distance downstream.

एक नाव की शांत जल में चाल10 किमी/घंटा है जबकि नदी की धारा की चाल 2 किमी /घंटा है यह नाव धारा की विपरीत एक निश्चित दूरी 4 घंटे में पूरी करती है , तो यह दूरी धारा की गति की दिशा में पूरा करने में कितना समय लगेगा ?

(a) 2 hrs 40 min/2 घंटा40 मिनट

(b) 3 hrs 15 min/ 3घंटा15 मिनट

(c) 3 hrs/ 3 घंटा

(d) 2 hrs 30 min/2 घंटा 30मिनट

Q2.  Two circles of radius 13 cm & 12 cm are concentric. A chord of the larger circle is a tangent of the smaller one. The4 5th length of the chord is

दो स्केन्द्रिये वृत्तों की त्रिज्याये 13 सेमी 12 सेमी है बड़े वृत्त की जीवा छोटे वृत्त की स्पर्श रेखा है तो उस जीवा की लम्बाई 4 5th का मान होगा

(a) 10 cm

(b) 8 cm

(c) 12 cm

(d) 15 cm

Q3. Four year ago, the ratio of the ages of A and B was 2 : 3 and after 4 years their age will become 5 : 7. Find their present age?

4 वर्ष पूर्व A और B की आयु का अनुपात 2:3था और 4वर्ष के बाद यह अनुपात 5:7 हो जाता है उनकी वर्तमान आयु ज्ञात करे

(a) 32 years/ वर्ष, 60 years/ वर्ष

(b) 35 years/ वर्ष, 50 years/ वर्ष

(c) 36 years/ वर्ष, 52 years/ वर्ष

(d) 37 years/ वर्ष, 37 years/ वर्ष

Q4. A sum of money amounts to Rs. 500 in 2 years and Rs.540 in 3 years at compound interest per annum, then the rate percent per annum is –

कोई  धन वार्षिक चक्रवृद्धि ब्याज की दर से 2 वर्ष में रूपए 500 ओर 3 वर्ष में रूपए  540 हो जाता है , तो  वार्षिक  ब्याज की  दर  है

(a) 6%

(b) 7%

(c) 8%

(d) 10%

Directions:(5-7) Percentage of different types of employees in a company in two consecutive years:

दिशा -निर्देश :(5-7): किसी कंपनी में दो अनुकर्मिक वर्षो में विभिन प्रकार के कर्मचारियों का प्रतिशत :

Study the graph carefully and answer the following Questions.

ग्राफ  का धयनपूर्वक अधयन करो और  प्रश्नों के उतर दो

Q5.  In 1997 the total number of which of the following types of pairs of employees was approximately equal to A type of employees in 1998 ?

1997 में निम्नलिखित में से किस प्रकार के कर्मचारी युगलों की कुल संख्या 1998 में A  प्रकार के कर्मचारियों के लगभग बराबर थी ?

(a) C and D

(b) D and E

(c) B and C

(d) A and C

Q6. From 1997 to 1998 in the case of which of the following types of employees the change was maximum?

1997 से 1998 तक निम्नलिखित में से किस प्रकार के कर्मचारियों के मामले में परिवर्तन अधिक था ?

(a) C

(b) B

(c) A

(d) D

Q7. What was the approximate difference in the number of B type of employees during 1997 and 1998?

1997 और 1998 में B प्रकार के कर्मचारियों की संख्या में अनुमानित अंतर कितना था ?

(a) 2085

(b) 2620

(c) 2285

(d) 2325

Q8: If the surface areas of two spheres are in the ratio 9:16, then the ratio of their volumes is –

यदि दो गोले के  पृष्ठ क्षेत्रफल 9:16 के अनुपात में है तो उनके आयतन का अनुपात क्या है ?

(a) 27: 64

(b) 64 : 27

(c) 9 : 16

(d) 16 : 9

Q9. What is the LCM of (6x³ + 60x² + 150x ) and (3x4+12x³ – 15x²) ?

(6x³ + 60x² + 150x )और (3x4+12x³ – 15x²) का  .. . क्या होगा?

(a) 6x²(x – 5)(x–1)

(b) 6x²(x + 5)(x + 1)

(c) 6x²(x + 5)² (x–1)

(d) 6x²(x–1)² (x + 5)²

Q10. A contractor undertakes to dig a canal 12 km long in 350 days and employs 45 men. After 200 days he finds that only 4.5 km of the canal has been completed. Find the number of extra men he must employ to finish the work on time.

एक ठेकेदार 12किमी लम्बी नहर 350 दिनों में खोदने में 45आदमियों को काम पर लगाता  है 200 दिन बाद वह पाता है की नहर का केवल 4.5 किमी ही पूरा हो पाया है काम को समय पर पूरा करने की लिए उसे और कितने आदमियों को काम पर लगाना होगा ?

(a) 45 men/ आदमी

(b) 55 men/ आदमी

(c) 65 men/ आदमी

(d) 75 men/ आदमी

Day1-Mathematics

Day1-Mathematics

To get all benefits students should join Pinnacle SSC CGL Online Coaching Course 2017 and 2018 or SSC CGL Hard Drive Course.

All The best !!

SSC CGL 2017 & 2018 Online Coaching New Batch – Click Here

You can also visit our You tube Channel :: 

English: Spot The Error, 600 most important questions.

Now Get All Notifications And Updates In Your E-mail Account Just Enter Your E-mail Address Below And Verify Your Account To Get More Updates :

Enter your email address: Subscribe Pinnacle:

 Mission 400  |  Online Coaching  |  SampleVideo Lectures  |  Hard Drive Course  |  Tier 1 90 Tests series with videos    |    Tier 1 90 Tests Series without Videos  |   Facebook group   |  Facebook Page     |     Youtube Channel

error: Content is protected !!